VAULT · Risk Register
Every material risk. What it looks like. What kills it. What we own to prevent it.
Scoring
Each risk scored on Likelihood (1-5) and Impact (1-5). Score = L × I. Priority = score band.
- 20-25 = P1 (existential)
- 12-19 = P2 (material)
- 6-11 = P3 (manage)
- 1-5 = P4 (accept + monitor)
The P1 register (existential)
R01. Ceilings and rigging on the wrong building
- Description: LOI signed on a property that cannot support pole rigging loads or does not have the ceiling height to enable the broadcast + competition build.
- L × I: 3 × 5 = 15 → but if it happens, it is fatal to the entire concept.
- Owner: Trill + GC + structural engineer.
- Prevention: Structural feasibility study before LOI is signed. Non-negotiable. Site scorecard in 04_MARKET_SELECTION_CHARLOTTE forces this.
- Mitigation if triggered: Kill LOI. Walk. Second-choice property waiting.
R02. Cash discipline breaks in Year 1
- Description: Buildout overruns, opening delay, or Y1 member ramp underperforms. Reserve depletes. Emergency dilution or shutdown.
- L × I: 3 × 5 = 15.
- Owner: Trill (CSO), fractional CFO, and monthly Founder Financial Review.
- Prevention: 12-18 month opex reserve locked before opening (governance in 05_FINANCE/07_FOUNDER_DISTRIBUTIONS). Buildout contingency 15% in budget. Monthly variance reporting Month 1 through Month 24.
- Mitigation if triggered: SBA line of credit standby. Emergency bridge from HNW angel pool identified in advance. Distribution freeze automatic.
R03. Taj gets pulled into daily operations
- Description: GM misfire or a crisis leads to Taj covering shifts, doing setup, or acting as operator. Burnout + brand dilution. Founder capacity is depleted at the moment strategic decisions are most important.
- L × I: 4 × 4 = 16.
- Owner: Trill + GM + advisor board.
- Prevention: Retained hospitality-industry recruiter (not LinkedIn) for GM. GM comp includes 2% equity through option pool for alignment. Advisor board watches for founder-in-ops signals monthly. Standing rule (memory-encoded) that no plan puts Taj back in ops delivery/setup.
- Mitigation if triggered: Emergency backfill from hospitality staffing agency (Aimbridge, Highgate). Interim GM authority extended to Director of Member Experience. Trill on-site more frequently to hold the room.
The P2 register (material)
R04. GM misfire
- Description: First GM hire does not perform. 12 months lost. Member churn. Brand standard erodes.
- L × I: 3 × 4 = 12.
- Prevention: Retained recruiter with hospitality background. 90-day review gate. Interim contract clause enabling clean exit before Year 1 close.
- Mitigation: 90-day trial exit. Backup candidate pool maintained.
R05. Pandemic redux Year 1 or Year 2
- Description: Health event forces temporary or extended closure. Revenue collapse before flywheel activates.
- L × I: 2 × 5 = 10 (upweighted given 2020 experience).
- Prevention: Full 13_PANDEMIC_RESILIENCE stack (MERV 14, UV-C, outdoor training deck, Day-1 digital membership, DTC apparel, corporate B2B contracts, 12-18 month reserve, own building or long fixed lease).
- Mitigation: Digital membership activates. Corporate + DTC revenue holds floor. Distribution freeze. Emergency line of credit drawn.
R06. THE VAULT INVITATIONAL Y1 underperforms
- Description: First-year competition fails to attract sponsors, streaming interest, or elite talent. Financial loss on Y1 event. National IP narrative wobbles.
- L × I: 3 × 4 = 12.
- Prevention: Sponsor + talent commitments pre-event. TWG production credibility as attractor. Break-even production budget with sponsor floor identified in 08_VAULT_INVITATIONAL/05_ECONOMICS. Streaming deal not required for Y1 success; live + sponsor + entry fees model.
- Mitigation: Y1 event framed as invitational not championship, headline pole/movement stars anchor. Y2 event pivots to true championship with lessons applied. Never bet the club on the competition.
R07. Buildout overrun or opening delay
- Description: GC underbid, permit delay, supply chain snag on custom finishes. 3-6 months late. Cash burn extends.
- L × I: 4 × 3 = 12.
- Prevention: GC with luxury build track record. 15% contingency in budget. Weekly buildout review with Trill, GC, architect. Long-lead items ordered Month 1 of buildout.
- Mitigation: Soft-open flexibility (invite-only) reduces urgency for full grand-open date.
R08. Corporate wellness B2B slow to close
- Description: Anchor accounts (BofA, Truist, Ally) take longer than expected. B2B revenue Y1 lags model.
- L × I: 4 × 3 = 12.
- Prevention: Soft pitches begin pre-open (Month -6). Fractional B2B sales support hired Month -3. Anchor account pilot pricing on offer.
- Mitigation: Model does not assume B2B revenue until Month 6. Y1 base case includes only 1 anchor account signed.
R09. Competitive entry from national brand
- Description: Equinox, Life Time, or a well-capitalized boutique announces Charlotte flagship 2027-2028.
- L × I: 3 × 4 = 12.
- Prevention: Speed to market (LOI signed 2026-Q4). Category-of-one positioning (pole + broadcast IP no competitor replicates). Founder-led brand gravity no chain matches.
- Mitigation: Compete on hospitality standard and IP, not on class variety or price. Deepen corporate + Signature-tier B2B contracts as moat.
R10. Franchise brand erosion (Y3+)
- Description: First franchisee dilutes the 5-star standard. Brand equity impaired before national scale.
- L × I: 3 × 4 = 12.
- Prevention: Franchisee screening (ADA-only, HNW requirement, hospitality track record). Field audit cadence. Termination triggers in franchise agreement. Taj creative director veto on GM hire + inaugural class of members.
- Mitigation: Aggressive brand-standard enforcement. First termination public (within franchise system) to set precedent.
The P3 register (manage)
R11. Instructor pipeline shortage (pole + dance)
- L × I: 3 × 3 = 9.
- Prevention: National recruiting from top pole studios and cirque programs. Housing stipend and signing bonuses. Y1 lead instructor comp above market by 20%.
R12. Membership churn in Y2
- L × I: 4 × 2 = 8.
- Prevention: Member NPS quarterly. Signature events + retreats + private access programs to retain Black Card tier. Loyalty tenure benefits at 12 and 24 months.
R13. Landlord or lease dispute
- L × I: 2 × 4 = 8.
- Prevention: Real estate attorney at LOI. Written TI allowance schedule. Force majeure clause negotiated.
R14. Instructor injury or member injury on pole
- L × I: 3 × 3 = 9.
- Prevention: Rigging inspection quarterly by certified rigger. Class waivers with pole-specific language. Progression gating (no advanced moves without prerequisite completion). Full 07_OPERATIONS/02_SAFETY_LIABILITY.
R15. Data breach or member privacy incident
- L × I: 2 × 4 = 8.
- Prevention: Cyber insurance rider. Tech stack SOC 2 or equivalent. Payment tokenization (never store card). Instructor + staff training on member confidentiality (celebrity + athlete members expected).
R16. Reputation attack (social media crisis)
- L × I: 3 × 3 = 9.
- Prevention: Crisis comms plan drafted pre-open. PR retainer with 24-hour response SLA. Taj + Trill trained on statement authorship.
The P4 register (monitor)
R17. Currency/interest rate shift affecting SBA rate
- Monitor at debt closing. Rerun model at commitment letter.
R18. Regional convention or event demand shift
- Not material to core model.
R19. Weather event forcing temporary closure
- Insurance rider (business interruption) covers.
R20. Retail apparel launch underperforms
- Not material to Y1-Y2. Retail launched Y2. Failure delays flywheel, not existential.
Review cadence
- Weekly: Trill + GM review the P1 register.
- Monthly: Full register reviewed. Rescore any risk that has moved. Add new risks. Retire resolved risks.
- Quarterly: Advisor board review. Founder Financial Review includes risk register update.
- Annual: Full rewrite of the register at anniversary of grand open.
Ownership summary
| Risk band | Owner |
|---|---|
| Real estate + buildout | Trill + GC + architect |
| Financial + capital | Trill + fractional CFO |
| Ops + hospitality | GM + Director Member Experience |
| Brand + PR | Taj + Marketing lead |
| Competition IP | TWG + VP Franchise (Y3+) |
| Legal + IP | Retained counsel |
| Franchise (Y3+) | VP Franchise Development |